Welcome to
Naizak
A customer driven local services organization.
We are a customer-driven, local services organization with a
deliberate policy to invest in people of high caliber and
specialization. A large part of that investment is in training
nationals and allowing them to participate in our economy.
Naizak
- Power Systems
Key References
A.
Turnkey Supply (Oil & Gas Sector)
Saudi Electricity Co. (Utility)
Petrokemya
JGC
Danieli
B.
Reference Listing
|
Year
|
Customer / Location |
Work Performed / Under Execution |
|
2008 |
Danieli
Jubail |
Installation, Testing, Commissioning and System
Performance Analysis of 1 x 75MVA, 115 / 13.8kV
Power Transformer |
|
2008 |
SEC – COA
Wadi Dawasir |
Turnkey Supply, Installation and Testing
of 1 x 150 MVA 132/33kV Power Transformer
|
|
2008 |
SEC – EOA
PP – |
Turnkey Supply, Installation and Testing of 1 x 100MVA
132/33kV Power Transformer |
|
2008 |
SEC – EOA
S/S 9000 – |
Turnkey Supply, Installation and Testing and
Commissioning of New 1 x 30MVAR, 33 kV Shunt Reactor and
Replacement of Existing Shunt Reactor |
|
2008 |
SEC – EOA
|
Turnkey Supply, Installation and Testing of 1 x 30MVA
69/13.8kV Power Transformer |
|
2007 |
SEC – EOA
Arar Power Plant |
Installation, Testing & Commissioning of 2 Panels
(distance Protection) at at Arar 132/33 kV S/S |
|
2007/8 |
SEC – WOA
Jeddah / Makkah / Madinah |
Turnkey Supply, Installation, Testing and Commissioning
of 4 x 40MVA 110/15kV Power Transformers |
|
2007/8 |
SEC-COA
PP9 |
Turnkey Supply, Installation, Testing and Commissioning
of 4 x 20MVA 33/13.8kV Power Transformers |
|
2007/8 |
SEC – COA
7038 S/S |
Turnkey Supply, Installation, Testing and Commissioning
of 1 x 20MVA 33/13.8kV Power Transformer |
|
2007/8 |
SEC – EOA
Jubail |
Turnkey Supply, Installation, Testing and Commissioning
of 1 x 66MVA 115/13.8kV Power Transformer
|
|
2007/8 |
SEC-WOA |
Reconnection of 33/13.8kV S/S by SCADA in Western
Operating Area
|
|
2007/08 |
Royal Commission |
Turnkey Supply, Installation, Testing and Commissioning
of 33kV Switching Station
|
|
2007/8 |
Saudi Aramco
Juaymah Gas Plant |
230kV High Voltage Insulator Coating Supply and
Commissioning
|
|
2007/8 |
SEC – COA
Hail |
Protection Modification at S/S 7903 & 7904 in Hail 33kv
Distribution Network
|
|
2007 |
SEC-EOA
Al Jouf |
Supply and Installation of new 13.8kV busduct assessing
of healthiness of Busduct and commissioning
|
|
2007 |
SEC – EOA
Al Jouf |
Turnkey Supply, Installation, Testing and Commissioning
of 2 x 37MVA 132/13.8kV Power Transformers
|
|
2006 |
Saudi Aramco
Shedgum Gas Plant |
230kV High Voltage Insulator Coating Supply, Apply and
Commissioning
|
|
2006 |
BEMCO – Siemens
PEC, |
Supply and supervision of 2 x 16MVA, 2 x 3300kVA, 1 x
1600kVA Oil Transformers and 3 x 800kVA Dry Type
Transformers
|
|
2006 |
SEC – EOA
Sakaka / Al Jouf |
Turnkey Supply, Installation, Testing and Commissioning
of 1 x 30MVA 132kV Power Transformer
|
|
2005/6 |
SEC – EOA
Arar – Khaldiah & Faislaiah |
Complete 33kV Substation Project Management, Turnkey
Supply, Installation, Testing & Commissioning of all
Major Electrical Equipment
|
|
2005 |
SEC – COA |
Turnkey Supply, Installation, Testing and of 2 x 40MVA
115/13.8kV Power Transformer
|
|
2005 |
SEC – EOA
Arar Faisaliah S/S |
Turnkey Supply, Installation, Testing and Commissioning
of 33kV Mobile Switchgear and System integration of new
with existing Switchgear |
|
2005 |
SEC – EOA
Arar Khalidiah S/S |
Turnkey Supply, Installation, Testing and Commissioning
of IOX Control & Relay Panel Control Desk |
|
2005 |
SEC – EOA
Arar – Khaldiah & Faisaliah |
Turnkey Supply, Installation, Testing and Commissioning
of 2 x 20MVA Power Transformers |
|
2005 |
SEC – EOA
Arar – Khaldiah & Faisaliah |
Turnkey Supply, Installation, Testing and Commissioning
of 12 x 33kV and 22 x 13.8kV Switchgear Panels
|
|
2004 |
QCHEM
Qatar Chemical Co. |
Repair and Maintenance Service of 2 x 75MVA Power
Trnasformers
|
|
2004 |
SEC- South
Tihama |
Supply, Installation, Testing and Commissioning
Supervision of 1 x 100MVA Power Transformer
|
|
2004 |
SEC- South
Jizan |
Supply, Installation, Testing and Commissioning
Supervision of 1 x 114MVA Power Transformer
|
|
2004 |
SEC- South
Asir |
Supply, Installation, Testing and Commissioning
Supervision of 1 x 90MVA Power Transformer
|
|
2001 |
SEC East – BEMCO
IDWA Substation |
Installation, Testing, and Commissioning of 2 x 40MVA
Power Transformer
|
|
1999 |
SEC – EOA
BEMCO |
Tofaih Substation – Installation, Testing and
Commissioning of 2 x 40MVA Power Transformer
|
|
1997 |
SEC EOA
|
Installation, Testing, and Commissioning of 4 x 40MVA
Power Transformers
|
|
2000 |
Sharjah Electricity (SEWA) |
Testing and Calibration of Protection Relay
|
|
2000 |
Sharjah Electricity (SEWA) |
Maintenance and Service of 132kV GIS Switchgear and
repair of 132 and 33kV Breaker
|
|
2000 |
|
Testing and Commissioning of 137 Distribution Package
Substation
|
|
2000 |
Abu Dhabi National Oil Co.
ADNOC |
Repair, Reinstallation, Teasing and Commissioning of 1 x
90MVA Power Transformer
|
|
2000 |
Abu Dhabi Oil Co. (ADCO) |
Repair, Reinstallation, Teasing and Commissioning of 1 x
60MVA Power Transformer
|
|
2000 |
Sharjah Electricity (SEWA) |
Repair, Reinstallation, Teasing and Commissioning of 2 x
75MVA Power Transformers
|
|
2000 |
|
Services, Installation, and Commissioning of 4 x 2000kVA
Distribution Transformers.
|
|
2000 |
|
Trouble Shooting and Services of 200 MV SF-6 Ring Main
Units
|
Office hours
+966 800 122 2800
+966 0503878093 24/7
Office hours
800 122 2900
+971 4 391 6314
Power Systems
- Overview
Site Search
NAIZAK Power System participating:
GCC Cigre Power 4th Conference 2008 & Exhibition
Manama – Bahrain (9-12 November 2008)
Subscribe to Naizak Newsletter
Enter your email address below:
Subscribe to Site Updates
Enter your email address below:
